In about three weeks' time, I will be testing for my Third Degree Black Belt in TaeKwonDo*. For the last few months now, I have been focusing on what I need to know to pass that test and practicing those things. Endlessly. Repeatedly. Over and over again. And then I do it some more.
I have decided that this is very much like casting on several hundred stitches of fingering weight yarn so you can knit a queen size blanket in garter stitch. There is nothing new to learn, just the repetition of the same series of motions to make one stitch and then another, and another and so on. There is no relief to be had at the end of a long knit row when you turn the work and begin the refreshing difference of the purl row ahead. There will only ever be more of the same until it is time to cast off, but until then there is only the endless, relentless monotony of the knit stitch.
Since my Second Degree test, I have learned two new forms (Keumgang Poomsae and another that is unique to our school), eight self-defense techniques, eight grab techniques, the school's form for the bamboo staff (we call it "stick form"), learned advanced kicking and board breaking techniques and, at least in theory, improved my sparring. I say "in theory" because 1) I really do not like sparring at all and 2) I'm terrified of getting seriously injured. Not because I'm going to get hit, but because I'm afraid of landing badly or off balance and ending up in the emergency room. Again.
I say that training for the test is like the blanket because of the sameness of it. Six days every week I go to class, do the warm-up, and then SaBumNim sends me into a corner of the dojang with one of the assistant instructors where I'm told to practice 1-8 of self-defense and grab techniques until the end of class. And before class is dismissed, I know I will be tested on them with the rest of the class watching. I have already been tested on them, and earned the tip proving that I performed them well enough to pass the test. I have been tested on them at least twice each week for the last four weeks and this will continue up until October 4. The big test, the real one that I have been preparing for, is on October 5.
So until then, I will be doing the daily exercise in patience and humility that is the martial artist's garter stitch blanket. I will go to class, I will do 1-8. And then I will do it again and again and again. Then I'll do it some more, but with people watching. This sequence will be repeated today in class, and the next day and the next and the next after that until I wake up on October 6 and realize that the previous day I finished my blanket. I have cast off; the project that once seemed endless is finished at last, and that now will be the time to start something new.
*It sounds far more impressive than it really is. By all rights, my black belt should have a little blue handicapped wheelchair sticker on it, like they put on the parking spaces and license plates. I have accrued so many injuries during my martial arts career that most of the curriculum has been heavily modified to accommodate my physical limitations. My instructor has invented new sparring techniques for me to minimize stress on my knees, and I don't do any jumping kicks. I have said for years that anyone who can run away has absolutely nothing to fear from me, because there's no way I could catch them.
Monday, September 16, 2013
Wednesday, September 11, 2013
Only One
Do you know how much one can be? I am rapidly learning that one ounce of fiber to spin each is day is rather a lot. Especially if my children expect to wear clean clothes and eat home-cooked meals.
I just finished spinning the singles from the mini-batts from Ever Improving Me, so only plying is left. This leaves me exactly one ounce behind in meeting my goal. I have come to the realization that I may have to reassess the feasibility of said goal. Anyway, here are my two bobbins of wintery icy singles:
The photo doesn't really show how the silk glistens against the main color, but trust me, it does. And it's lovely.
I think I'm going to now aim for about 5 ounces each week, including plying. That was the big omission in version 1 of the RRC: no allowance for plying time. Or a day off. So we'll see how the RRC.2 goes for the next week.
But for now, I gotta go. I need to make dinner and the laundry still doesn't wash itself.
I just finished spinning the singles from the mini-batts from Ever Improving Me, so only plying is left. This leaves me exactly one ounce behind in meeting my goal. I have come to the realization that I may have to reassess the feasibility of said goal. Anyway, here are my two bobbins of wintery icy singles:
The photo doesn't really show how the silk glistens against the main color, but trust me, it does. And it's lovely.
I think I'm going to now aim for about 5 ounces each week, including plying. That was the big omission in version 1 of the RRC: no allowance for plying time. Or a day off. So we'll see how the RRC.2 goes for the next week.
But for now, I gotta go. I need to make dinner and the laundry still doesn't wash itself.
Monday, September 9, 2013
The Campaign Presses On
So have been spinning quite a bit these last few days. I hope my motivation doesn't diminish over the next two months!
I finished the singles out of the Loop roving and chain-plied them to more-or-less preserve the color changes. After a soak in the sink and a solid "thwack" on the counter, the yarn is now happily drying on the back porch. I know I'm almost a competent spinner, but every once in a while, I wind up with something that I'm fairly pleased with. This is one of those times. Isn't it pretty? (Just nod & say, "Yes! It's fabulous!" even if you don't agree. It's OK, I don't mind the little white lie!)
Next up is a pair of mini-batts from Ever Improving Me on Etsy. I have no idea how long I have had these, but they are the loveliest icy blue/green with streaks of pure white silk running through. I think they are a mohair and silk blend, but the label doesn't specify. The two batts total 2.75 ounces, so this should take care of the amount I was short on yesterday, as well as the next two days' worth in order to meet my RRC (Rhinebeck Readiness Campaign) goal. I can't decide on the final product, though. A nice 2-ply lace weight and for a lace scarf? Or one ply nice and thin wrapped around a fluffy ply of the softest, whitest angora? Hmm. I may have do to try some test skeins to see which I like better.
I just love how the white silk glistens against the color. These batts are definitely making me think wintery thoughts.
And, finally, photographic proof that I do, in fact, knit, and sometimes I even finish something. This is the Liliaceae Shawlette designed by Angelika Luidl. I made it in Road to China Light by the Fibre Company. It's a beautiful magenta with a blue overdye, but I have lost the tags so I don't know exactly which color it is. The fabric is soft, luxurious and drapes beautifully. The pattern was fun without keeping me tied to the chart too much, and I'm thinking about making another one for myself since this one is a gift. I hope she will like it!!
I finished the singles out of the Loop roving and chain-plied them to more-or-less preserve the color changes. After a soak in the sink and a solid "thwack" on the counter, the yarn is now happily drying on the back porch. I know I'm almost a competent spinner, but every once in a while, I wind up with something that I'm fairly pleased with. This is one of those times. Isn't it pretty? (Just nod & say, "Yes! It's fabulous!" even if you don't agree. It's OK, I don't mind the little white lie!)
Next up is a pair of mini-batts from Ever Improving Me on Etsy. I have no idea how long I have had these, but they are the loveliest icy blue/green with streaks of pure white silk running through. I think they are a mohair and silk blend, but the label doesn't specify. The two batts total 2.75 ounces, so this should take care of the amount I was short on yesterday, as well as the next two days' worth in order to meet my RRC (Rhinebeck Readiness Campaign) goal. I can't decide on the final product, though. A nice 2-ply lace weight and for a lace scarf? Or one ply nice and thin wrapped around a fluffy ply of the softest, whitest angora? Hmm. I may have do to try some test skeins to see which I like better.
I just love how the white silk glistens against the color. These batts are definitely making me think wintery thoughts.
And, finally, photographic proof that I do, in fact, knit, and sometimes I even finish something. This is the Liliaceae Shawlette designed by Angelika Luidl. I made it in Road to China Light by the Fibre Company. It's a beautiful magenta with a blue overdye, but I have lost the tags so I don't know exactly which color it is. The fabric is soft, luxurious and drapes beautifully. The pattern was fun without keeping me tied to the chart too much, and I'm thinking about making another one for myself since this one is a gift. I hope she will like it!!
Thursday, September 5, 2013
The Rhinebeck Readiness Campaign and an Update
First, the update, in which I do not come off looking like a particularly smart person. This is where the project that "disappeared" went:
Friday, August 2, 2013
Curse You, "Safe Place"
I think we all have a "Safe Place" somewhere in our homes. It's where we put things that we don't need right now, but want to find easily in the future. So we put them in the "Safe Place".
I don't know about you, but I'm pretty sure my safe place gets up & moves around in the middle of the night, or has somehow acquired an invisibility cloak from Harry Potter. I'm seriously considering renaming my "Safe Place" to "Black Hole".
Why am I telling you this? I'm telling you this because I put one of my knitting projects down somewhere in my house and now I can't find it. The bugger has gone completely AWOL. I have looked in all the usual places. I have looked in many unlikely places. Nothing. It has vanished without a trace, without a witness to tell me it's last whereabouts.
Oh-and here's the kicker- did I mention that this is one of two projects I'm working on that has a deadline? As in, the birthday is at the end of September, this is a lace shawl and it needs to be done 2-3 weeks in advance so it can be shipped overseas to get there in time kind of deadline? Of course it wouldn't be the socks I'm making for me so it doesn't matter when they're finished--
When I find that cursed Safe Place, I'm going to tag it with a GPS emitter of some kind so I can find it again.
**Sigh**
I don't know about you, but I'm pretty sure my safe place gets up & moves around in the middle of the night, or has somehow acquired an invisibility cloak from Harry Potter. I'm seriously considering renaming my "Safe Place" to "Black Hole".
Why am I telling you this? I'm telling you this because I put one of my knitting projects down somewhere in my house and now I can't find it. The bugger has gone completely AWOL. I have looked in all the usual places. I have looked in many unlikely places. Nothing. It has vanished without a trace, without a witness to tell me it's last whereabouts.
Oh-and here's the kicker- did I mention that this is one of two projects I'm working on that has a deadline? As in, the birthday is at the end of September, this is a lace shawl and it needs to be done 2-3 weeks in advance so it can be shipped overseas to get there in time kind of deadline? Of course it wouldn't be the socks I'm making for me so it doesn't matter when they're finished--
When I find that cursed Safe Place, I'm going to tag it with a GPS emitter of some kind so I can find it again.
**Sigh**
Labels:
Aaargh,
black holes,
deadlines,
safe places
Thursday, July 25, 2013
When the Relationship is Over, But the Knitting Isn't
So, many of you know about the book, "Never Knit Your Man A Sweater*" Where the * refers to the subtitle that says something about getting the ring first.
Well, it has become my recent experience that the presence of the ring doesn't matter. And it's not a new ring, it's a 21+ year-old ring that apparently no longer matters.
My question is, what do you do with works in progress that were intended for your soon-to-be Ex? What do you do about the sweaters you made for him that need mending, but which you hadn't done before you realized your relationship was over? Do you finish them? Do you put them in a bag along with the rest of his stuff & let him deal with it one way or another? Do you rip them out & recycle the yarn?
This is actually one of the hardest aspects of the divorce for me. I only give my knitting to a very select group of people. If you have knitting from me, it means your on my "A" list and quite important to me. The same goes for any other handmade item, such as quilts or other sewn things. Even my cooking. I spend time, care and love in all of these activities. It may look like I'm avoiding getting the laundry done to the rest of the world, but to me doing these things is how I show the people I care about the most that I do care about them. I like the fact that I can take any number of raw materials (yarn, fabric, food) and turn it into something that can make another person happy.
So then what do you do when you have these projects that were started because you cared about the recipient, but now that's no longer true? I'm very sentimental about my knitting. I know that at least one of the WIP's in question will be impossible for me to finish. I will hate every second I spend on it and that is not how I want knitting to be. I also know that every time I look at the yarn for that sweater it will only bring up unpleasant emotions, and I can certainly do without that, which means that recycling it for my own use is also out of the question. I think this one is getting ripped, recycled & shipped off to live with someone else.
The other WIP is a pair of socks, and while I'm not particularly wild about working on them either, I feel more obligated to finish them somehow. Maybe because they have languished on the needles longer, or because they're smaller, who knows? But I feel like finishing them gives me a moral high road somehow. (Spiteful or revengeful knitting? I don't like the sound of that either.) And so I feel stuck at the moment.
Suggestions as to how to become unstuck would be greatly appreciated.
Well, it has become my recent experience that the presence of the ring doesn't matter. And it's not a new ring, it's a 21+ year-old ring that apparently no longer matters.
My question is, what do you do with works in progress that were intended for your soon-to-be Ex? What do you do about the sweaters you made for him that need mending, but which you hadn't done before you realized your relationship was over? Do you finish them? Do you put them in a bag along with the rest of his stuff & let him deal with it one way or another? Do you rip them out & recycle the yarn?
This is actually one of the hardest aspects of the divorce for me. I only give my knitting to a very select group of people. If you have knitting from me, it means your on my "A" list and quite important to me. The same goes for any other handmade item, such as quilts or other sewn things. Even my cooking. I spend time, care and love in all of these activities. It may look like I'm avoiding getting the laundry done to the rest of the world, but to me doing these things is how I show the people I care about the most that I do care about them. I like the fact that I can take any number of raw materials (yarn, fabric, food) and turn it into something that can make another person happy.
So then what do you do when you have these projects that were started because you cared about the recipient, but now that's no longer true? I'm very sentimental about my knitting. I know that at least one of the WIP's in question will be impossible for me to finish. I will hate every second I spend on it and that is not how I want knitting to be. I also know that every time I look at the yarn for that sweater it will only bring up unpleasant emotions, and I can certainly do without that, which means that recycling it for my own use is also out of the question. I think this one is getting ripped, recycled & shipped off to live with someone else.
The other WIP is a pair of socks, and while I'm not particularly wild about working on them either, I feel more obligated to finish them somehow. Maybe because they have languished on the needles longer, or because they're smaller, who knows? But I feel like finishing them gives me a moral high road somehow. (Spiteful or revengeful knitting? I don't like the sound of that either.) And so I feel stuck at the moment.
Suggestions as to how to become unstuck would be greatly appreciated.
Wednesday, March 30, 2011
One More Day and a Wake-Up
It dawned on me the other day that I have been utterly neglecting my blog, and that I do enjoy writing.
What brought this realization about is that this Friday evening, April 1 at 7 pm, I will be taking my test for a Second Degree Black Belt in TaeKwonDo. While this may seem like a string of randomness, the two are in fact connected. One of the required tasks for the test is to put together a book about various aspects of your life. While not a full-on autobiography, an essay about the student's life since passing the First Degree Test is required. Once I had finished the essay is when I realized that I missed the writing, and that led to remembering that I have an outlet for it, which had not been attended to in some time. So, here I am.
These last few weeks leading up to the test have been rather stressful for me, and an odd tightrope act of balancing the need to improve my strength and endurance while not getting hurt so I can't take the test. It has been tricky, let me tell you.
So, like any good knitter, I have turned to my craft as a way to take my mind off of the test. The problem is that I may have turned to it a little too much...
Here is a pair of socks that I started for a dear friend's birthday (already passed). They are the "Split Reed" socks from Think Outside the Sox. I was going gangbusters on them until I realized that they were sized for Sasquatch and so out they came. The intended recipient is physically quite the opposite of Sasquatch. A quick adjustment of the number of pattern repeats & off again, making up for lost time, until the heel had to be redone three times. I'm not sure exactly how that happened, I think I was in a frenzy of Test Stress, but in any case, here I am 3 days after the birthday with less than one finished sock. They are, however, very pretty. They're in Mountain Colors Bearfoot, in semi-solid red whose name I don't recall and for which I have lost the ball band.
I also started an THE entrelac shawl, which is worthy of several posts all on it's own; I'll save that saga for another time. It is, however, gorgeous, for me, and I have been having a very hard time not working on it 24/7. The yarn is Gedifra's Fashion Trend Stripe in color 4616.
Finally, another belated birthday present. This is the Astaire Vest is from "Sculptured Knits" by Jean Moss. My revised version of the pattern is being made in Rowan's Felted Tweed, color170. I had to re-draft the pattern in order to use this yarn, which is a bit finer than what was called for. The pattern is fun and surprisingly quick to knit, and results in a nicely masculine herringbone type texture. It's quite subtle, especially in this rather dark blue, but I am quite pleased with the results.
Once finished with the test on Friday, I may have to find a way of coping with the stress of getting the two birthday gifts done before the next birthday rolls around, and finishing the shawl before it's too hot to have it in my lap. I suppose I could always take extra TaeKwonDo classes...
Subscribe to:
Posts (Atom)



